Biotel d.o.o. was founded in 2014 and registered for business operations in the area of renewable energy sources, with the pellet production as a primary activity. The production facility is located in Andrijevica in the closed area of 6000 sqm and open area of 32000 sqm. The factory employs 30 employees. The production capacity is 23000 tons per year. New equipment installed at the plant, was obtained in the Netherlands (CPM – presses and mills), the Netherlands (Dutchdragon – chipper), Poland (drying facilty), Italy (Essegi / TMG – packing machines), while O & M Engineering from Serbia, has prepared the technology project and supplied the factory with all the other equipment.